Millersburg substation interconnection queue

2 active projects totalling 28.1 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
28.1active MW
5total filed
Queue IDProjectkVMWResourceStatus
AH1-163 Millersburg 69 kV 69 60 Solar Withdrawn
AH2-224 Millersburg 69 kV 69 50 Battery Withdrawn
AH2-222 Millersburg 69 kV 69 36 Solar Withdrawn
AH1-570 Millersburg 69 kV 69 15.6 Solar Active
AH1-571 Millersburg 69 kV 69 12.5 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.