Not Specified, KY interconnection queue

3 active projects totalling 787.1 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
787.1active MW
6total filed
Queue IDProjectkVMWResourceStatus
AH1-721 Laurel-Cooper 161 kV 161 759 Gas Active
AH1-644 Spicewood Metering 138 kV 138 65 Solar Withdrawn
AH1-427 Tommy Gooch - Garrard County 69 kV 69 60 Solar Withdrawn
AH1-570 Millersburg 69 kV 69 15.6 Solar Active
AH1-571 Millersburg 69 kV 69 12.5 Solar Active
AH1-136 Falcon - Middle Creek 46 kV 46 12 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.