Kuller Road substation interconnection queue
1 active project totaling 0.2 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Kuller Road as the point of interconnection, all in Passaic County, NJ.
Target commercial operation dates as filed run from Jul 2010 to Jun 2012 (2 filings).
1active projects
0.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| V4-028 | Kuller Road SP | 13.2 | 1.5 | Solar | Withdrawn | Jul 2010 |
| W4-059 | Metro Division Headquarters | 13 | 0.2 | Solar | In Service | Jun 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Passaic County, NJ
No other substation in Passaic County, NJ is named as a point of interconnection in the PJM queue.