Substation Scout

Kuller Road substation interconnection queue

1 active project totalling 0.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
V4-028 Kuller Road SP 13.2 1.5 Solar Withdrawn
W4-059 Metro Division Headquarters 13 0.2 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.