Substation Scout

Guardian substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Guardian as the point of interconnection, all in Noble County, IN.

Target commercial operation dates as filed run from Dec 2022 to Dec 2023 (2 filings).

Transmission owner as filed: AEP (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-453 Guardian 138 kV 138 84 Solar Withdrawn Dec 2023
AG1-454 Guardian 138 kV 138 50 Battery Withdrawn Dec 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Noble County, IN

No other substation in Noble County, IN is named as a point of interconnection in the PJM queue.

All 7 PJM queue filings in Noble County, IN.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →