Noble, IN interconnection queue

2 active projects totalling 60 MW in the PJM queue, plus 5 with terminal status (shown greyed).

2active projects
60active MW
7total filed
Queue IDProjectkVMWResourceStatus
AG1-453 Guardian 138 kV 138 84 Solar Withdrawn
AH2-282 Burnworth 138 kV 138 75 Hybrid Withdrawn
AG1-454 Guardian 138 kV 138 50 Battery Withdrawn
C01-1799 Forest G. Hiple - Dunton Lake 345 kV 345 50 Solar Withdrawn
AG2-029 Forest G. Hipple-Dunton Lake 345 kV 345 32.5 Solar Active
C01-1989 05GUARDN 138 kV 138 27.5 Solar Active
W3-060 Kendallville 138kV 138 15.6 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.