Greenville substation interconnection queue

1 active project totalling 14 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
14active MW
2total filed
Queue IDProjectkVMWResourceStatus
P50 Greenville Electric Generating Station 69 14 Gas In Service
X3-002 Greenville Solar 12 1.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.