Darke, OH interconnection queue
1 active project totalling 14 MW in the PJM queue, plus 9 with terminal status (shown greyed).
1active projects
14active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-079 | Greenville-West Milton 138 kV | 138 | 99 | Solar | Withdrawn |
| V3-016 | Greenville-West Milton 138kV | 138 | 39 | Wind | Withdrawn |
| AD2-087 | Randolf 138kV | 138 | 35.2 | Wind | Withdrawn |
| AF2-218 | Gettysburg 69 kV | 69 | 30 | Solar | Withdrawn |
| U2-062 | Randolph 138kV | 138 | 24.4 | Wind | Withdrawn |
| P50 | Greenville Electric Generating Station | 69 | 14 | Gas | In Service |
| W1-041 | W. Milton-Greenville | n/r | 6.5 | Wind | Withdrawn |
| W2-067 | Amsterdam 138kV | 138 | 6.5 | Wind | Withdrawn |
| X2-077 | Hursch Road 69kV | 69 | 3.8 | Solar | Withdrawn |
| X3-002 | Greenville Solar | 12 | 1.3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.