Gladstone substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Gladstone as the point of interconnection, all in Nelson County, VA.
Target commercial operation date as filed: Sep 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-127 | Gladstone 138 kV | 138 | 40 | Battery | Withdrawn | Sep 2024 |
| AI2-344 | Gladstone 138 kV | 138 | 17 | Solar | Withdrawn | Sep 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Nelson County, VA
No other substation in Nelson County, VA is named as a point of interconnection in the PJM queue.