Nelson, VA interconnection queue
1 active project totalling 53 MW in the PJM queue, plus 4 with terminal status (shown greyed).
1active projects
53active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-220 | Coleen-Clifford 138 kV | 138 | 66.7 | Solar | Withdrawn |
| AG1-124 | Wild Rose Solar Project | 138 | 53 | Solar | EP |
| AG2-127 | Gladstone 138 kV | 138 | 40 | Battery | Withdrawn |
| AI2-344 | Gladstone 138 kV | 138 | 17 | Solar | Withdrawn |
| AH2-138 | Arrington Circuit 12.47 kV | 12.5 | 6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.