Substation Scout

Fostoria Central-Greenlawn-Howard substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
U4-028 Seneca Wind 138 13 Wind Withdrawn
U4-029 Seneca Wind 138 13 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.