0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Fostoria Central-Greenlawn-Howard as the point of interconnection, all in Seneca County, OH.
Target commercial operation date as filed: Dec 2020 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U4-028 | Seneca Wind | 138 | 13 | Wind | Withdrawn | Dec 2020 |
| U4-029 | Seneca Wind | 138 | 13 | Wind | Withdrawn | Dec 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Seneca County, OH
- Amsden - Fremont Center: none active of 2 filed