Effort Mountain-Gilbert substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-283 | Effort Mountain-Gilbert 138 kV | 138 | 18 | Solar | Withdrawn |
| AG2-185 | Effort Mountain-Gilbert 138 kV | 138 | 6 | Solar | Withdrawn |
| AG2-186 | Effort Mountain-Gilbert 138 kV | 138 | 3.1 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.