Corey substation interconnection queue
1 active project totaling 155.7 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Corey as the point of interconnection, all in St. Joseph County, MI.
Target commercial operation dates as filed run from Sep 2021 to Dec 2029 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-176 | Three Lakes Solar | 138 | 155.7 | Hybrid | EP | Dec 2029 |
| AE2-266 | Corey 138kV | 138 | 64.2 | Hybrid | Withdrawn | Sep 2021 |
| AE2-265 | Corey 138 kV | 138 | 47.8 | Hybrid | Withdrawn | Sep 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Corey (AEP, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in St. Joseph County, MI
- Mottville: none active of 2 filed