Campbell-Kiesters substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Campbell-Kiesters as the point of interconnection, all in Butler County, PA.

Target commercial operation dates as filed run from Dec 2023 to Dec 2026 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-420 Campbell-Kiesters 138 kV 138 42 Solar Withdrawn Dec 2023
AI2-415 Campbell-Kiesters 138 kV 138 20.3 Solar Withdrawn Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Butler County, PA

No other substation in Butler County, PA is named as a point of interconnection in the PJM queue.

All 13 PJM queue filings in Butler County, PA.