Campbell-Kiesters substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-420 Campbell-Kiesters 138 kV 138 42 Solar Withdrawn
AI2-415 Campbell-Kiesters 138 kV 138 20.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.