Buckhorn substation interconnection queue

1 active project totalling 80 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
80active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-461 Buckhorn 138 kV 138 80 Battery Active
AH1-173 Buckhorn 34.5 kV 34.5 10 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.