Tazewell, VA interconnection queue

1 active project totalling 29.4 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
29.4active MW
8total filed
Queue IDProjectkVMWResourceStatus
AH1-461 Buckhorn 138 kV 138 80 Battery Withdrawn
AC2-098 Buckhorn-Lonesome Pine 138kV 138 60 Solar Withdrawn
AH1-133 Saltville - Tazewell 138 kV 138 29.4 Solar Active
S54 Tazewell 138kV 138 26 Wind Withdrawn
U2-017 Tazewell-Baileysville 138kV 138 26 Wind Withdrawn
U2-071 Tazewell-Saltville 138kV 138 26 Wind Withdrawn
U2-050 Lonesome Pine 138kV 138 13 Wind Withdrawn
AH1-173 Buckhorn 34.5 kV 34.5 10 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.