Blaine - Roanoke substation interconnection queue
1 active project totalling 200 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
200active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-102 | Blaine - Roanoke 138 kV | 138 | 200 | Battery | Withdrawn |
| C01-1626 | Blaine - Roanoke 138 kV | 138 | 200 | Battery | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.