Franklin, VA interconnection queue

1 active project totalling 200 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
200active MW
5total filed
Queue IDProjectkVMWResourceStatus
AH2-102 Blaine - Roanoke 138 kV 138 200 Battery Withdrawn
C01-1626 Blaine - Roanoke 138 kV 138 200 Battery Active
AH1-164 Oak Level - Tank Hill 138 kV 138 21 Solar Withdrawn
AH1-174 Westlake 34.5 kV 34.5 12 Solar Withdrawn
AH1-180 Westlake 34.5 kV 34.5 5.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.