Substation Scout

Bath County substation interconnection queue

2 active projects totalling 340 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
340active MW
3total filed
Queue IDProjectkVMWResourceStatus
P16 Bath County n/r 340 Hydro In Service
I09 Bath County 500kV 500 252 Hydro Withdrawn
P31 Bath County n/r 0 Not reported In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.