Substation Scout

Bath, VA interconnection queue

1 active project totaling 340 MW in the PJM queue, plus 1 with terminal status (shown grayed).

1active projects
340active MW
2total filed
Queue IDProjectkVMWResourceStatus
P16 Bath County n/r 340 Hydro In Service
I09 Bath County 500kV 500 252 Hydro Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first