Substation Scout

Baker - Broadford substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-466 Baker - Broadford 765 kV 765 360 Solar Withdrawn
AH1-467 Baker - Broadford 765 kV 765 120 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.