Boone, KY interconnection queue

1 active project totalling 48 MW in the PJM queue, plus 6 with terminal status (shown greyed).

1active projects
48active MW
7total filed
Queue IDProjectkVMWResourceStatus
AH1-466 Baker - Broadford 765 kV 765 360 Solar Withdrawn
AH1-240 Wayne County 161 kV 161 120 Solar Withdrawn
AH1-467 Baker - Broadford 765 kV 765 120 Battery Withdrawn
AH1-239 Upchurch - Zula 69 kV 69 48 Solar Active
AH1-428 Tommy Gooch - Garrard County 69 kV 69 40 Battery Withdrawn
AC1-137 Erlanger 12kV 12 0 Solar Withdrawn
AC1-138 Bend Station 12kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.