Substation Scout

Franklin Mill Power Facility

PJM queue ID X1-038

Franklin Mill Power Facility (X1-038) is listed in the PJM interconnection queue as a gas request filed at 0 MW (a net change or energy-only filing) in City of Franklin, VA. The filing names Union Camp as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2012.

Queue IDX1-038
Project nameFranklin Mill Power Facility
Status (as published)In Service
SubstationUnion Camp
Point of interconnectionUnion Camp 115kV
CountyCity of Franklin
StateVA
Voltage115 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2012-12-31
Source datasetserial

Same substation and county

City of Franklin, VA: 1 request in the PJM queue, 1 active totaling 0 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy35
MW capacity0
MFO35

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.