Frackville - Gilberton 69 kV
PJM queue ID C01-2135
Frackville - Gilberton 69 kV (C01-2135) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in schuylkill County, PA. The filing names Frackville - Gilberton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 1, 2030.
| Queue ID | C01-2135 |
|---|---|
| Project name | Frackville - Gilberton 69 kV |
| Status (as published) | Active |
| Substation | Frackville - Gilberton |
| Point of interconnection | Frackville - Gilberton 69 kV |
| County | schuylkill |
| State | PA |
| Voltage | 69 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-09-01 |
| Source dataset | cycle |
Same substation and county
schuylkill, PA: 1 request in the PJM queue, 1 active totaling 0 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Mountain City Solar, LLC |
|---|---|
| Transmission owner | PPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 50.0 |
| MW capacity | 0.0 |
| MFO | 50.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.