Steele - Easton 138 kV (C01-2098) is listed in the PJM interconnection queue as a 130 MW battery project in Talbot County, MD. The filing names Steele - Easton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2030.

Queue IDC01-2098
Project nameSteele - Easton 138 kV
Status (as published)Active
SubstationSteele - Easton
Point of interconnectionSteele - Easton 138 kV
CountyTalbot
StateMD
Voltage138 kV
Capacity130 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-06-01
Source datasetcycle

Same substation and county

Talbot, MD: 16 requests in the PJM queue, 6 active totaling 269.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperNewEdge Power Holdings III LLC
Transmission ownerDPL
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy130.0
MW capacity130.0
MFO130.0
Submitted date4/24/2026
Last updated10/19/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.