Substation Scout

Martins Creek 230 kV

PJM queue ID C01-2037

Martins Creek 230 kV (C01-2037) is listed in the PJM interconnection queue as a 300 MW battery project in Northampton County, PA. The filing names Martins Creek as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of February 28, 2029.

Queue IDC01-2037
Project nameMartins Creek 230 kV
Status (as published)Active
SubstationMartins Creek
Point of interconnectionMartins Creek 230 kV
CountyNorthampton
StatePA
Voltage230 kV
Capacity300 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-02-28
Source datasetcycle

Same substation and county

Martins Creek substation: 9 requests in the PJM queue, 6 active totaling 1,314.9 MW.

Queue IDProjectMWResourceStatus
A12Lower Mt Bethel600GasIn Service
C01-1800Martins Creek 230 kV265.3GasActive
AD1-037Lower Mount Bethel86.6GasIn Service
X1-108Lower Mount Bethel33GasIn Service
F03Martins Creek #330CoalIn Service
U2-053Martins Creek800GasWithdrawn
U2-099Martins Creek 230kV700GasWithdrawn
AG1-267Martins Creek 69 kV8BatteryWithdrawn

Northampton, PA: 39 requests in the PJM queue, 14 active totaling 2,510.4 MW.

A substation with the same name is named in PJM transmission planning materials: Martins Creek (PPL, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperMC Project Company LLC
Transmission ownerPPL
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy300.0
MW capacity300.0
MFO600.0
Submitted date4/25/2026
Last updated6/18/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first