Byron Station 6 345 kV
PJM queue ID C01-1980
Byron Station 6 345 kV (C01-1980) is listed in the PJM interconnection queue as a nuclear request filed at 0 MW (a net change or energy-only filing) in Ogle County, IL. The filing names Byron Station 6 as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 8, 2027.
| Queue ID | C01-1980 |
|---|---|
| Project name | Byron Station 6 345 kV |
| Status (as published) | Active |
| Substation | Byron Station 6 |
| Point of interconnection | Byron Station 6 345 kV |
| County | Ogle |
| State | IL |
| Voltage | 345 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Nuclear |
| Resource category | Nuclear (normalized for filtering) |
| Target commercial operation | 2027-10-08 |
| Source dataset | cycle |
Same substation and county
Ogle, IL: 40 requests in the PJM queue, 15 active totaling 1,727 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Constellation Energy Generation, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 46.0 |
| MW capacity | 0.0 |
| MFO | 2576.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.