Northampton 34.5 kV
PJM queue ID C01-1662
Northampton 34.5 kV (C01-1662) is listed in the PJM interconnection queue as a 4.2 MW solar project in Northampton County, NC. The filing names Northampton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 25, 2028.
| Queue ID | C01-1662 |
|---|---|
| Project name | Northampton 34.5 kV |
| Status (as published) | Active |
| Substation | Northampton |
| Point of interconnection | Northampton 34.5 kV |
| County | Northampton |
| State | NC |
| Voltage | 34.5 kV |
| Capacity | 4.2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-08-25 |
| Source dataset | cycle |
Same substation and county
Northampton, NC: 3 requests in the PJM queue, 1 active totaling 4.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Fall Line Solar Farm, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 7.0 |
| MW capacity | 4.2 |
| MFO | 7.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/16/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.