AE2-045 TAP 345 kV
PJM queue ID C01-1634
AE2-045 TAP 345 kV (C01-1634) is listed in the PJM interconnection queue as a 48 MW solar project in Pulaski County, IN. The filing names AE2-045 TAP as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 24, 2028.
| Queue ID | C01-1634 |
|---|---|
| Project name | AE2-045 TAP 345 kV |
| Status (as published) | Active |
| Substation | AE2-045 TAP |
| Point of interconnection | AE2-045 TAP 345 kV |
| County | Pulaski |
| State | IN |
| Voltage | 345 kV |
| Capacity | 48 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-04-24 |
| Source dataset | cycle |
Same substation and county
Pulaski, IN: 21 requests in the PJM queue, 11 active totaling 1,270.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Bottlebrush Solar Energy LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 47.98 |
| MFO | 275.0 |
| Submitted date | 4/25/2026 |
| Last updated | 6/15/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.