Brandywine 230 kV
PJM queue ID C01-1505
Brandywine 230 kV (C01-1505) is listed in the PJM interconnection queue as a 620 MW gas project in Prince George's County, MD. The filing names Brandywine as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 15, 2031.
| Queue ID | C01-1505 |
|---|---|
| Project name | Brandywine 230 kV |
| Status (as published) | Active |
| Substation | Brandywine |
| Point of interconnection | Brandywine 230 kV |
| County | Prince George's |
| State | MD |
| Voltage | 230 kV |
| Capacity | 620 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2031-04-15 |
| Source dataset | cycle |
Same substation and county
Prince George's, MD: 57 requests in the PJM queue, 14 active totaling 3,551.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | KMC Thermo, LLC |
|---|---|
| Transmission owner | PEPCO |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 620.0 |
| MW capacity | 620.0 |
| MFO | 620.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.