05OHIO COAT 69 kV
PJM queue ID C01-1050
05OHIO COAT 69 kV (C01-1050) is listed in the PJM interconnection queue as a 20 MW hydro project in OH. The filing names 05OHIO COAT as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of January 31, 2029.
| Queue ID | C01-1050 |
|---|---|
| Project name | 05OHIO COAT 69 kV |
| Status (as published) | Active |
| Substation | 05OHIO COAT |
| Point of interconnection | 05OHIO COAT 69 kV |
| County | Not reported |
| State | OH |
| Voltage | 69 kV |
| Capacity | 20 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalized for filtering) |
| Target commercial operation | 2029-01-31 |
| Source dataset | cycle |
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-14 | Status change | n/a | Withdrawn → Active |
Additional filed fields
| Developer | Pike Island Hydropower Corporation |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 19.99 |
| MW capacity | 19.99 |
| MFO | 19.99 |
| Submitted date | 4/15/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.