PJM queue ID AH1-345

Bealeton Solar (AH1-345) is listed in the PJM interconnection queue as a 8.4 MW solar project in Fauquier County, VA. The filing names Remington 324 as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 1, 2026.

Queue IDAH1-345
Project nameBealeton Solar
Status (as published)EP
SubstationRemington 324
Point of interconnectionRemington 324 34.5 kV
CountyFauquier
StateVA
Voltage34.5 kV
Capacity8.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-01
Source datasetcycle

Same substation and county

Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-02 Status change n/a Active → EP

Full change log →

Additional filed fields

DeveloperBealeton Solar, LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleTC2
StageFinal Agreement
MW energy14.0
MW capacity8.4
MFO14.0
Submitted date9/10/2021
Last updated7/7/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first