Bealeton Solar
PJM queue ID AH1-345
Bealeton Solar (AH1-345) is listed in the PJM interconnection queue as a 8.4 MW solar project in Fauquier County, VA. The filing names Remington 324 as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 1, 2026.
| Queue ID | AH1-345 |
|---|---|
| Project name | Bealeton Solar |
| Status (as published) | EP |
| Substation | Remington 324 |
| Point of interconnection | Remington 324 34.5 kV |
| County | Fauquier |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 8.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-12-01 |
| Source dataset | cycle |
Same substation and county
Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-02 | Status change | n/a | Active → EP |
Additional filed fields
| Developer | Bealeton Solar, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| MW energy | 14.0 |
| MW capacity | 8.4 |
| MFO | 14.0 |
| Submitted date | 9/10/2021 |
| Last updated | 7/7/2026 |