Pequest River-Furnace Brook Tap 34.5 kV III
PJM queue ID AG2-626
Pequest River-Furnace Brook Tap 34.5 kV III (AG2-626) is listed in the PJM interconnection queue as a 5.3 MW solar project in Warren County, NJ. The filing names Pequest River-Furnace Brook Tap III as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 30, 2027.
| Queue ID | AG2-626 |
|---|---|
| Project name | Pequest River-Furnace Brook Tap 34.5 kV III |
| Status (as published) | Active |
| Substation | Pequest River-Furnace Brook Tap III |
| Point of interconnection | Pequest River-Furnace Brook Tap 34.5 kV III |
| County | Warren |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 5.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-08-30 |
| Source dataset | cycle |
Same substation and county
Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Chamberlain East Solar Farm LLC |
|---|---|
| Transmission owner | JCPL |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 12.5 |
| MW capacity | 5.25 |
| MFO | 12.5 |
| Submitted date | 3/31/2021 |
| Last updated | 8/19/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.