Substation Scout

Pequest River-Furnace Brook Tap 34.5 kV III

PJM queue ID AG2-626

Pequest River-Furnace Brook Tap 34.5 kV III (AG2-626) is listed in the PJM interconnection queue as a 5.3 MW solar project in Warren County, NJ. The filing names Pequest River-Furnace Brook Tap III as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 30, 2027.

Queue IDAG2-626
Project namePequest River-Furnace Brook Tap 34.5 kV III
Status (as published)Active
SubstationPequest River-Furnace Brook Tap III
Point of interconnectionPequest River-Furnace Brook Tap 34.5 kV III
CountyWarren
StateNJ
Voltage34.5 kV
Capacity5.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-30
Source datasetcycle

Same substation and county

Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperChamberlain East Solar Farm LLC
Transmission ownerJCPL
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy12.5
MW capacity5.25
MFO12.5
Submitted date3/31/2021
Last updated8/19/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first