Substation Scout

Foul Rift Solar Farm

PJM queue ID AG1-348

Foul Rift Solar Farm (AG1-348) is listed in the PJM interconnection queue as a 6.5 MW solar project in Warren County, NJ. The filing names Pequest River-Washington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 15, 2025.

Queue IDAG1-348
Project nameFoul Rift Solar Farm
Status (as published)In Service
SubstationPequest River-Washington
Point of interconnectionPequest River-Washington 34.5 kV
CountyWarren
StateNJ
Voltage34.5 kV
Capacity6.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-11-15
Source datasetserial

Same substation and county

Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy15.4
MW capacity6.47
MFO15.4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first