Substation Scout

Henry Solar

PJM queue ID AG1-100

Henry Solar (AG1-100) is listed in the PJM interconnection queue as a 12 MW solar project in Crawford County, PA. The filing names Venango-Saegertown as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2027.

Queue IDAG1-100
Project nameHenry Solar
Status (as published)Engineering and Procurement
SubstationVenango-Saegertown
Point of interconnectionVenango-Saegertown 34.5 kV
CountyCrawford
StatePA
Voltage34.5 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-31
Source datasetserial

Same substation and county

Crawford, PA: 56 requests in the PJM queue, 9 active totaling 915.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.