Cass County Solar
PJM queue ID AF2-396
Cass County Solar (AF2-396) is listed in the PJM interconnection queue as a 200 MW hybrid project in Cass County, MI. The filing names Stinger as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of June 1, 2029.
| Queue ID | AF2-396 |
|---|---|
| Project name | Cass County Solar |
| Status (as published) | EP |
| Substation | Stinger |
| Point of interconnection | Stinger 138 kV |
| County | Cass |
| State | MI |
| Voltage | 138 kV |
| Capacity | 200 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2029-06-01 |
| Source dataset | cycle |
Same substation and county
Cass, MI: 20 requests in the PJM queue, 7 active totaling 1,778.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Steelhead Solar, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 200.0 |
| MW capacity | 200.0 |
| MFO | 200.0 |
| Submitted date | 3/31/2020 |
| Last updated | 2/23/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.