Pleasant Grove Solar

PJM queue ID AF2-349

Pleasant Grove Solar (AF2-349) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in McHenry County, IL. The filing names SILVER LAKE- CHERRY VALLEY as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of September 30, 2029.

Queue IDAF2-349
Project namePleasant Grove Solar
Status (as published)EP
SubstationSILVER LAKE- CHERRY VALLEY
Point of interconnectionSILVER LAKE- CHERRY VALLEY 345 KV
CountyMcHenry
StateIL
Voltage345 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-30
Source datasetcycle

Same substation and county

McHenry, IL: 35 requests in the PJM queue, 12 active totaling 1,510 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperDeriva Energy Solar, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy300.0
MW capacity0.0
MFO300.0
Submitted date3/31/2020
Last updated2/6/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first