Farmers Valley Solar
PJM queue ID AF2-238
Farmers Valley Solar (AF2-238) is listed in the PJM interconnection queue as a 12 MW solar project in Bradford County, PA. The filing names Mansfield-South Troy as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 31, 2028.
| Queue ID | AF2-238 |
|---|---|
| Project name | Farmers Valley Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Mansfield-South Troy |
| Point of interconnection | Mansfield-South Troy 34.5 kV |
| County | Bradford |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-07-31 |
| Source dataset | serial |
Same substation and county
Bradford, PA: 52 requests in the PJM queue, 14 active totaling 913.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 12 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.