Harmony Plains Solar and Storage Facility (AF1-320) is listed in the PJM interconnection queue as a 42 MW hybrid project in Warren County, NJ. The filing names Merrill Creek as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of March 28, 2029.
| Queue ID | AF1-320 |
|---|---|
| Project name | Harmony Plains Solar and Storage Facility |
| Status (as published) | Engineering and Procurement |
| Substation | Merrill Creek |
| Point of interconnection | Merrill Creek 115 kV |
| County | Warren |
| State | NJ |
| Voltage | 115 kV |
| Capacity | 42 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2029-03-28 |
| Source dataset | serial |
Same substation and county
Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 70 |
| MW capacity | 42 |
| MFO | 70 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.