CL-Route 58 B
PJM queue ID AF1-167
CL-Route 58 B (AF1-167) is listed in the PJM interconnection queue as a 8.1 MW solar project in Clarion County, PA. The filing names West Freedom-C&K Coal as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of January 31, 2026.
| Queue ID | AF1-167 |
|---|---|
| Project name | CL-Route 58 B |
| Status (as published) | Suspended |
| Substation | West Freedom-C&K Coal |
| Point of interconnection | West Freedom-C&K Coal 25 kV |
| County | Clarion |
| State | PA |
| Voltage | 25 kV |
| Capacity | 8.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-01-31 |
| Source dataset | serial |
Same substation and county
Clarion, PA: 25 requests in the PJM queue, 7 active totaling 320.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 13.515 |
| MW capacity | 8.109 |
| MFO | 13.515 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.