Eastern Cottontail Solar
PJM queue ID AE2-048
Eastern Cottontail Solar (AE2-048) is listed in the PJM interconnection queue as a 147.7 MW solar project in Fairfield County, OH. The filing names Muskingum-W. Millersport as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2028.
| Queue ID | AE2-048 |
|---|---|
| Project name | Eastern Cottontail Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Muskingum-W. Millersport |
| Point of interconnection | Muskingum-W. Millersport 345 kV |
| County | Fairfield |
| State | OH |
| Voltage | 345 kV |
| Capacity | 147.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | serial |
Same substation and county
Fairfield, OH: 10 requests in the PJM queue, 5 active totaling 607.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 220 |
| MW capacity | 147.7 |
| MFO | 220 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.