Leaf River Wind
PJM queue ID AE1-114
Leaf River Wind (AE1-114) is listed in the PJM interconnection queue as a 34 MW wind project in Ogle County, IL. The filing names Maryland-Lancaster as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of September 1, 2029.
| Queue ID | AE1-114 |
|---|---|
| Project name | Leaf River Wind |
| Status (as published) | EP |
| Substation | Maryland-Lancaster |
| Point of interconnection | Maryland-Lancaster 138 kV |
| County | Ogle |
| State | IL |
| Voltage | 138 kV |
| Capacity | 34 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2029-09-01 |
| Source dataset | cycle |
Same substation and county
Ogle, IL: 40 requests in the PJM queue, 15 active totaling 1,727 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Leaf River Wind, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 150.0 |
| MW capacity | 34.0 |
| MFO | 150.0 |
| Submitted date | 9/13/2018 |
| Withdrawn remarks | Customer Initiated Withdrawal |
| Last updated | 5/15/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.