Lyons Solar
PJM queue ID AD2-115
Lyons Solar (AD2-115) is listed in the PJM interconnection queue as a 13 MW solar project in Berks County, PA. The filing names Lyons-Moselem as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 31, 2023.
| Queue ID | AD2-115 |
|---|---|
| Project name | Lyons Solar |
| Status (as published) | In Service |
| Substation | Lyons-Moselem |
| Point of interconnection | Lyons-Moselem 69kV |
| County | Berks |
| State | PA |
| Voltage | 69 kV |
| Capacity | 13 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-08-31 |
| Source dataset | serial |
Same substation and county
Berks, PA: 63 requests in the PJM queue, 12 active totaling 1,177.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 13 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.