PJM queue ID AD2-077

Energy Mountain (AD2-077) is listed in the PJM interconnection queue as a 100 MW battery project in Bucks County, PA. The filing names Buxmont as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of October 31, 2029.

Queue IDAD2-077
Project nameEnergy Mountain
Status (as published)Engineering and Procurement
SubstationBuxmont
Point of interconnectionBuxmont 69 kV
CountyBucks
StatePA
Voltage69 kV
Capacity100 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-31
Source datasetserial

Same substation and county

Buxmont substation: 3 requests in the PJM queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
AD2-050Buxmont 69kV200BatteryWithdrawn
AG1-115Buxmont 69 kV100BatteryWithdrawn

Bucks, PA: 19 requests in the PJM queue, 9 active totaling 1,363.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity100
MFO150

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.