Cedar Lane Solar
PJM queue ID AB1-176
Cedar Lane Solar (AB1-176) is listed in the PJM interconnection queue as a 1.5 MW solar project in Queen Anne's County, MD. The filing names Price II as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of April 1, 2026.
| Queue ID | AB1-176 |
|---|---|
| Project name | Cedar Lane Solar |
| Status (as published) | Under Construction |
| Substation | Price II |
| Point of interconnection | Price 25kV II |
| County | Queen Anne's |
| State | MD |
| Voltage | 25 kV |
| Capacity | 1.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-04-01 |
| Source dataset | serial |
Same substation and county
Queen Anne's, MD: 45 requests in the PJM queue, 8 active totaling 82.7 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-02 | Status change | n/a | Engineering and Procurement → Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 4 |
| MW capacity | 1.5 |
| MFO | 4 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.