Pondtown Solar 1

PJM queue ID AB1-142

Pondtown Solar 1 (AB1-142) is listed in the PJM interconnection queue as a 13.5 MW solar project in Queen Anne's County, MD. The filing names Church-Wye Mills II as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.

Queue IDAB1-142
Project namePondtown Solar 1
Status (as published)In Service
SubstationChurch-Wye Mills II
Point of interconnectionChurch-Wye Mills 138 kV II
CountyQueen Anne's
StateMD
Voltage138 kV
Capacity13.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-31
Source datasetserial

Same substation and county

Queen Anne's, MD: 45 requests in the PJM queue, 8 active totaling 82.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy19.8
MW capacity13.5
MFO39.6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.