Wyalusing 34.5kV
PJM queue ID AA2-133
Wyalusing 34.5kV (AA2-133) is listed in the PJM interconnection queue as a 19.9 MW gas project in Bradford County, PA. The filing names Wyalusing as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 31, 2019.
| Queue ID | AA2-133 |
|---|---|
| Project name | Wyalusing 34.5kV |
| Status (as published) | In Service |
| Substation | Wyalusing |
| Point of interconnection | Wyalusing 34.5kV |
| County | Bradford |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 19.9 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2019-05-31 |
| Source dataset | serial |
Same substation and county
Bradford, PA: 52 requests in the PJM queue, 14 active totaling 913.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 19.9 |
| MW capacity | 19.9 |
| MFO | 19.9 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.