Alpha Battery Storage Facility
PJM queue ID AA2-082
Alpha Battery Storage Facility (AA2-082) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Warren County, NJ. The filing names Alpha as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 20, 2018.
| Queue ID | AA2-082 |
|---|---|
| Project name | Alpha Battery Storage Facility |
| Status (as published) | In Service |
| Substation | Alpha |
| Point of interconnection | Alpha 34.5kV |
| County | Warren |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2018-10-20 |
| Source dataset | serial |
Same substation and county
Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 0 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.