Alpha Battery Storage Facility

PJM queue ID AA2-082

Alpha Battery Storage Facility (AA2-082) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Warren County, NJ. The filing names Alpha as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 20, 2018.

Queue IDAA2-082
Project nameAlpha Battery Storage Facility
Status (as published)In Service
SubstationAlpha
Point of interconnectionAlpha 34.5kV
CountyWarren
StateNJ
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2018-10-20
Source datasetserial

Same substation and county

Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity0
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.