Piney Station (Piney 1-3)
PJM queue ID AA1-037
Piney Station (Piney 1-3) (AA1-037) is listed in the PJM interconnection queue as a 5.3 MW hydro project in Clarion County, PA. The filing names Piney Hydro as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2015.
| Queue ID | AA1-037 |
|---|---|
| Project name | Piney Station (Piney 1-3) |
| Status (as published) | In Service |
| Substation | Piney Hydro |
| Point of interconnection | Piney Hydro 34.5kV |
| County | Clarion |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 5.3 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalized for filtering) |
| Target commercial operation | 2015-06-01 |
| Source dataset | serial |
Same substation and county
Clarion, PA: 25 requests in the PJM queue, 7 active totaling 320.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5.26 |
| MW capacity | 5.26 |
| MFO | 33.26 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.