Substation Scout

Wetzel, WV interconnection queue

1 active project totalling 36.4 MW in the PJM queue.

1active projects
36.4active MW
1total filed
Queue IDProjectkVMWResourceStatus
S70 Willow Island Hydro Generation Project 138 36.4 Hydro In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.