16 active projects totalling 627 MW in the PJM queue, plus 10 with terminal status (shown greyed).

16active projects
627active MW
26total filed
Queue IDProjectkVMWResourceStatus
Z1-078 Broadford-Jackson Ferry Phase II 765kV 765 777 Gas Withdrawn
Y2-058 Broadford-Jackson's Ferry 765kV 765 668 Gas Withdrawn
A02 Chesapeake 138 315 Other In Service
Z2-017 Bristers Ox 500kV 500 237 Not reported In Service
U2-056 West Point n/r 88.7 Other Withdrawn
Z2-100 Boykin 115kV 115 20 Solar Withdrawn
AB1-135 Charles City Solar 34.5 14 Solar Withdrawn
P27 Bethel LF 34.5 13 Gas In Service
AB1-152 Stevensburg Solar 34.5 7.6 Solar Withdrawn
W1-003 Oak Hall Project A n/r 7.6 Solar In Service
W1-004 Oak Hall Project B n/r 7.6 Solar In Service
W1-005 Oak Hall Project C n/r 7.6 Solar In Service
W1-006 Oak Hall Project D n/r 7.6 Solar In Service
W1-037 East Lima-South Kenton 138kV 138 7.6 Solar Withdrawn
Z1-100 Oak Hal lProject A n/r 4.2 Solar In Service
Z1-101 Oak Hall Project B n/r 4.2 Solar In Service
Z1-102 Oak Hall Project C n/r 4.2 Solar In Service
Z1-103 Oak Hall n/r 4.2 Solar In Service
AA1-025 Oak Hall A n/r 3.7 Solar In Service
AA1-026 Oak Hall B n/r 3.7 Solar In Service
AA1-027 Oak Hall C n/r 3.7 Solar In Service
AA1-028 Oak Hall D n/r 3.7 Solar In Service
T47 Mt. Storm-Doubs 500kV 500 0 Not reported Withdrawn
U2-088 Meadow Brook 500kV 500 0 Not reported Withdrawn
U3-005 Meadow Brook n/r 0 Not reported Withdrawn
Y1-068 MeadWestvaco Covington Mill Site 138 0 Other In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.